Maybe the question has very long beard but I didn´t found an answer: Can I change the order of my Stomps in the Profiler Stage. So far I think I only can replace a stomp by another. But I would like for example change a chorus in front of the amp with a flanger after the amp to check how it sounds.
And just to be a pain in the ass: WE NEED A REAL EDITOR TO DO THINGS LIKE THIS! IT´S A SHAME, THAT AN EFFECTUNIT THIS PRIZE CAN´T BE EDITED ON PC!!!
Change order of stomps
- doclatus
- Thread is marked as Resolved.
-
-
Don´t know about the "Stage" , but on the "Rack" and "Toaster" you can put any
effect at any stomp in any order .... So technically you could have different Chorus
on all 8 stomps .... or whatever
Cheers !
-
Yes you can and it is fairly easy and powerful at the same time. Look here:
Moving Stomps - Kemper Tips and Tricks
Probably this will c larify all you're asking for
-
Thanks for the hints. But: There is no stomp button at the stage! So there should be another trick!?
-
You can put any FX into any slot. If you want nothing in the slot, load a blank(its at the top of the list)
-
Quote
You can put any FX into any slot. If you want nothing in the slot, load a blank(its at the top of the list)
Thanks
But the question is: If all slots are full, how can I change the order of for ex. a delay in slot 5 and a chorus in slot 4 without overwriting the effects, just change the order? -
You can save FX settings just like rigs, then you can load anywhere you want and have your favorite settings for each FX.
-
It would be much easier with an editor...
-
You´re damn right!!!!!
-
+1